
To properly install the floor first started with having to level the substrate. The substrate was sleepers with gypcrete poured between. The gyprete was not filled to the top. The other installer recommended using “extra” glue. No a good idea
,
To properly install the floor first started with having to level the substrate. The substrate was sleepers with gypcrete poured between. The gyprete was not filled to the top. The other installer recommended using “extra” glue. No a good idea